28 May 2015

Elpro signed contract with Noryards

Elpro has signed a contract with Noryards Fosen for the delivery of electro installation on a supply vessel for ship owner Boa. The contract includes project management, purchase, manufacturing, installation, testing, commissioning of the systems.

This is an important contract in a challenging market, which shows that Elpro is competitive with in a difficult time in the maritime sector. The hull will be built at Tersan Shipyard in Turkey , the fitting of the equipment will all be done at Noryards verft at Kvithyll, Fosen. Engineering work will start right away, but the main installation work will start after the hull arrives in Kvithyll. Elpro Solutions will prepare us much work as possible in early stages to save both costs and time while keeping the quality up to the highest standards. This project is the first delivery with the new Noryards Design, which will be a milestone for Noryards and will give Elpro the possibility to make, and use tailermade solutions for both installations technics and innovative products.

Elpro is very pleased that Boa is so progressive and sees the need to build new vessels while it awards the contracts locally in the region.